111 Harper Road sits minutes from the Volkswagen / PowerCo battery gigafactory site — fuel cubes, on-site refuelling, propane for cure heat, and bulk diesel into the build and the operations that follow.
Fuel cubes on the job site, on-site refuelling for heavy equipment, propane for cure heat — through the largest single industrial investment in Ontario in a generation.
On-site refuelling and cardlock access for the manufacturers and logistics fleets across the St. Thomas industrial belt and the 401 corridor.
Coloured diesel and propane for Elgin’s ~1,200 farms — mixed oilseed/grain, dairy, and the greenhouse and specialty crops along the lakeshore.
St. Thomas is no longer just a railway-town-turned-manufacturing-centre — Volkswagen and PowerCo’s $7-billion EV battery gigafactory in northeast St. Thomas is the largest single industrial investment in Ontario in a generation, and our 111 Harper Road depot is minutes from the site.
St. Thomas grew 10.1% from 2016 to 2021 — among the fastest-growing small cities in Canada — and the manufacturing anchors that were already there (Masco, Formet, Presstran, Steelway, ETBO, North Star Windows) have absorbed the inbound construction demand alongside the gigafactory build. The 350-acre full industrial park footprint is sized for 90 GWh of annual capacity — roughly one million EVs a year at full build.
St. Thomas sits south of the 401 — the corridor that ties the gigafactory build into the broader Southwestern Ontario logistics network.
The 2026 mobile-fuelling licence applies across the St. Thomas job-site network and the 401 yards alike.
The federal carbon-charge change and what it meant for commercial propane on construction sites and process work.
A named rep takes the call — diesel, propane, lubricants, DEF on one invoice, one route.
Standing routes across nine regions. Same rep year-round; off-hours emergency dispatch through the same number.
Marketing Intelligence by Candid